Syllad

Syllad

The Rising Meghalaya

  • Home
  • Meghalaya
  • North East
  • National
  • Global
  • Sports
  • Covid_19
  • Opinion
  • Advertisement
  • Contact
  • About
  • Meghalaya HC directs Govt to submit action taken report to protect Myntdu River

    Syllad | The Rising MeghalayaNovember 19, 2024

    WhatsApp
    Share
    Share
    Tweet
    Pin

    The Meghalaya High Court on Tuesday directed the state government to submit an action taken report to protect the Myntdu River in Jaintia Hills region.

    In its order passed after hearing a PIL on the matter, the bench comprising chief justice Indra Prasanna Mukherji and Justice W Diengdoh said, “The Amicus Curiae is directed to file a report by 28th February, 2025. The government will also file a report indicating the action taken and also responding to the report of the Amicus Curiae by 13th March, 2025.”

    The Amicus Curiae P Yobin, in his joint inspection report has made a beautiful depiction of the importance of the Myntdu River flowing through the Jaintia region and thereafter into Bangladesh.

    It irrigates two fertile valleys in this state – Pynthor Nein and Pynthor Wah providing sustenance to about 40,000 people. The river is worshipped as a goddess and regarded as the Tawiar Takan (divine angel guardian) by the local people.

    The grievance made in the petition is that permission has been given by the government to do construction work by the side of the river. Such construction is being done indiscriminately resulting in unloading of debris into the river bed. Secondly, the government has not taken adequate steps to stop erosion of the river resulting in deposits of silt in the river bed. The combined effect is choking up of the river, preventing adequate flow of water for cultivation, drinking and other purposes.

    The bench however stated that it is satisfied from the report filed today by the AAG that the government has taken steps to prevent soil erosion and also to remove the debris generated by construction work and deposited in the river.

    “It appears from the report that the process is time consuming. It is pointed out by the Amicus Curiae that the dry season has started and it is likely to become drier in the near future.

    Some emergent measures are required to facilitate the free flow of water in the river. We direct that the government shall continue with the work they have already undertaken,” it said.

    The bench further directed that an appropriate administrative order should be issued by the government immediately prohibiting any materials generated from construction work to be deposited in the river and directing that it should be taken away by truck or any other vehicle to a place designated by the administration and dumped there.

    “Secondly, up to a distance from the side of the river, inwards construction work should be regulated in terms of distance to be maintained from the bank of the river inwards and the volume of construction to be sanctioned by the government in a fair, transparent and reasonable manner,” it stated in the order.

    Google News Button syllad

    Continue Reading

    Syllad | The Rising Meghalaya

    Syllad is a fully digital news portal from Meghalaya. With tagline “Syllad-The Rising Meghalaya” Syllad brings voices of Meghalaya to the rest of the world.

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    STAY CONNECTED

         Facebook

       Instagram

       Youtube

       Twitter

    SITE LINKS

    • About
    • Advertise with us
    • Hiring Freelance Writers
    • Contact us
    • Privacy Policy
    • Grievance Redressal
    • Refund policy
    • Terms and Conditions
    • Advertisement

    © 2019 Syllad

    Powered By AbodeOrigin | Marketing Wire
    Empanelled With Directorate of Information & Public Relations
    Government of Meghalaya