Syllad

Syllad

The Rising Meghalaya

  • Home
  • Meghalaya
  • North East
  • National
  • Global
  • Sports
  • Covid_19
  • Opinion
  • Advertisement
  • Contact
  • About
  • Load shedding to start in Meghalaya

    Syllad | The Rising MeghalayaFebruary 13, 2021

    WhatsApp
    Share
    Share
    Tweet
    Pin

    The Director Distribution MePDCL, Shillong in a statement issued today has informed that in view of the Power Regulations by PGCIL, and considering the low water level of Umiam reservoir, MePDCL is bound to impose load shedding to its consumers throughout the state of Meghalaya w.e.f. 00:00 hrs of 14/02/2021 on a rotational basis, till further notice.

    The details of the load shedding area-wise will be intimated subsequently. (MIPR).

    Google News Button syllad

    Continue Reading

    Syllad | The Rising Meghalaya

    Syllad is a fully digital news portal from Meghalaya. With tagline “Syllad-The Rising Meghalaya” Syllad brings voices of Meghalaya to the rest of the world.

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    STAY CONNECTED

         Facebook

       Instagram

       Youtube

       Twitter

    SITE LINKS

    • About
    • Advertise with us
    • Hiring Freelance Writers
    • Contact us
    • Privacy Policy
    • Grievance Redressal
    • Refund policy
    • Terms and Conditions
    • Advertisement

    © 2019 Syllad

    Powered By AbodeOrigin | Marketing Wire
    Empanelled With Directorate of Information & Public Relations
    Government of Meghalaya