Syllad

Syllad

The Rising Meghalaya

  • Home
  • Meghalaya
  • North East
  • National
  • Global
  • Sports
  • Covid_19
  • Opinion
  • Advertisement
  • Contact
  • About
  • Temporary repair and closure of bridge on Laskein Barato Road

    Syllad | The Rising MeghalayaJune 8, 2023

    WhatsApp
    Share
    Share
    Tweet
    Pin

    The Executive Engineer of PWD (Roads) Shangpung Division, Shangpung, has informed that the temporary repair work for Bug Bridge No. 10/1 on Myntang River, located on Laskein Barato Road under the jurisdiction of Laskein Block, is scheduled to take place on June 10.

    The bridge is currently in a weak and distressed condition, necessitating immediate attention.

    The repair work will commence at 10:00 AM and is expected to continue until 5:00 PM. During this period, the bridge will remain closed and all vehicles will not be allowed to ply.

    Google News Button syllad

    Syllad | The Rising Meghalaya

    Syllad is a fully digital news portal from Meghalaya. With tagline “Syllad-The Rising Meghalaya” Syllad brings voices of Meghalaya to the rest of the world.

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    STAY CONNECTED

         Facebook

       Instagram

       Youtube

       Twitter

    SITE LINKS

    • About
    • Advertise with us
    • Hiring Freelance Writers
    • Contact us
    • Privacy Policy
    • Grievance Redressal
    • Refund policy
    • Terms and Conditions
    • Advertisement

    © 2019 Syllad

    Powered By AbodeOrigin | Marketing Wire
    Empanelled With Directorate of Information & Public Relations
    Government of Meghalaya