Syllad

Syllad

The Rising Meghalaya

  • Home
  • Meghalaya
  • North East
  • National
  • Global
  • Sports
  • Covid_19
  • Opinion
  • Advertisement
  • Contact
  • About
  • New rules for installing solar lights in Amlarem Sub Division

    Syllad | The Rising MeghalayaSeptember 13, 2021

    WhatsApp
    Share
    Share
    Tweet
    Pin

    The Sub-Divisional Officer, Amlarem Civil Sub-Division, Amlarem has informed that in light of only few remaining Stand Alone Solar lights, new rules have been framed which are as follows.

    Rules:
    (1) Process to apply:
    Only applications from the Executive Committee of the Dorbar Shnong will be entertained with the signatures of the members of the Executive Committee.

    (2) The application must indicate:
    (a) Number of Solar Lights required.
    (b) Places where the lights will be installed: – The lights can only be installed outside places of public interest like Community halls, schools, Anganwadi, Sub-Center, Tourist site and market areas.

    Once approved an amount of Rs.6250 /- has to be deposited for each light the committee has to submit a compliance certificate within a month of the receipt of light. 

    Google News Button syllad

    Syllad | The Rising Meghalaya

    Syllad is a fully digital news portal from Meghalaya. With tagline “Syllad-The Rising Meghalaya” Syllad brings voices of Meghalaya to the rest of the world.

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    STAY CONNECTED

         Facebook

       Instagram

       Youtube

       Twitter

    SITE LINKS

    • About
    • Advertise with us
    • Hiring Freelance Writers
    • Contact us
    • Privacy Policy
    • Grievance Redressal
    • Refund policy
    • Terms and Conditions
    • Advertisement

    © 2019 Syllad

    Powered By AbodeOrigin | Marketing Wire
    Empanelled With Directorate of Information & Public Relations
    Government of Meghalaya